Estimating sediment yield from a forest road network using SEDMODEL and GIS technique (case study Arasbaran forests)

Document Type : Original Research

Authors
1 Soil Conservation and Watershed Management Department, Agriculture &Natural Resources Research Center of East Azerbaijan, Tabriz, Iran
2 Soil Conservation & Watershed Management Research Institute (SCWMRI), Tehran. AREEO, Iran.
3 Soil Conservation and Watershed Management Department, Agriculture &Natural Resources Research Center of East Azerbaijan, AREEO, Tabriz, Iran,
Abstract
Aims This study has been done to investigate the effects of access road network of Arasbaran forest areas on erosion in order to achieve appropriate criteria for sustainable development in forest areas while protecting forest soil.

Materials & Methods This research was carried out to introduce the SEDMODEL and its capabilities in estimating the production of sediment from road construction Sutanchay watershed in Arasbaran forest, located in the northwest of Iran. From road networks, 10km selected for research. Initially, the maps of geology, slope, rainfall, and drainage density, were prepared in the GIS system. Then, excavation trenches, road surface coverage, and traffic volume were examined in 34 stations through field surveys. The statistical method of Fisher distribution was used to compare the model estimation and observation values.

Findings Statistical analysis of the data showed that there was no significant difference between sediment delivery and Metric method in the erosion assessment resulting from access roads. Standard Error of the metric method and the SEDMODEL was calculated to be 1.34×10-3 and 1.37×10-3, respectively. The results showed that sedimentation caused by road surface was more than 19,000tons, of which 240ton are related to 3km of asphalt road and the rest are related to 7km of dirt road. Total sedimentation of the watershed was estimated to be 46,000ton.

Conclusion The application of sediment delivery model provides a realistic estimate of forest soil erosion caused by the road network. This model can be considered as a planning criterion in the sustainable development of forest areas.
Keywords

Subjects


References:
1. Toscani, P., W. Sekot, and F. Holzleitner, Forest Roads from the Perspective of Managerial Accounting—Empirical Evidence from Austria. Forests, 2020. 11(4).
2. Kastridis, A., Impact of Forest Roads on Hydrological Processes. Forests, 2020. 11(11).
3. Wemple, B., et al., Ecohydrological disturbances associated with roads: Current knowledge, research needs, and management concerns with reference to the tropics. Ecohydrology, 2018. 11.
4. Kastridis, A. and D. Stathis, Evaluation of hydrological and hydraulic models applied in typical Mediterranean Ungauged watersheds using post-flash-flood measurements. J. Hydrol, 2020. 7(12).
5. Kastridis, A., C. Kirkenidis, and M. Sapountzis, An integrated approach of flash flood analysis in ungauged mediterranean watersheds using post-flood surveys and unmanned aerial vehicles. Hydrol. Process, 2020. 1(20).
6. Ramos-Scharrón, C.E. and M.C. LaFevor, The role of unpaved roads as active source areas of precipitation excess in small watersheds drained by ephemeral streams in the Northeastern Caribbean. J. Hydrol, 2016. 533: p. 168–179.
7. Surfleet, C.G., A.E. Skaugset, and M.W. Meadows, Road runoff and sediment sampling for determining road sediment yield at the watershed scale. Canadian Journal of Forest Resources, 2011. 41: p. 1970-1980.
8. Akay, A.E., et al., Estimating sediment yield from a forest road network by using a sediment prediction model and GIS techniques. Building and Environment, 2008. 43(5): p. 687-695.
9. F., D., Cross-drain placement to reduce sediment delivery from forest roads to streams. . 2003, University of Washington: U.S.A. p. 225.
10. Akay, A.E., Applying the Decision Support System, TRACER, to Forest Road Design. WJAF, 2005. 20(3): p. 191-184.
11. Parsakhoo, A., et al., Prediction of the soil erosion in a forest and sediment yield from road network through GIS and SEDMODEL. International Journal of Sediment Research, 2014. 29(1): p. 118-125.
12. Asadollahi, Z., S. Yosefi, and M. Mohammady, Sediment Yield Estimation Due to Forest Road Network Using SEDMDEL and GIS. Journal of Environmental Science and Technology, 2016. 18(2): p. 71-82.
13. Dalir, P., R. Naghdi, and V. Gholami, Modelling of forest road sediment in the northern forest of Iran (Lomir Watershed). JOURNAL OF FOREST SCIENCE, 2014. 60(3): p. 109–114.
14. Farokhzadeh, B., F. Ghasemi Aghbash, and A. karami, An Estimation of the Sediment Yield from a Forest Road: A Case Study of Shabankare Watershed in Kermanshah, Iran. journal Of Environmental Erosion Researches, 2017. 27(3): p. 70-85.
15. Carl, S.C. and C. Li, Impact of planting grass on terrene roads to avoid soil erosion. Landscape and Urban Planning, 2006. 78: p. 205-216.
16. Mehrevarz Moghanloo K. Comprehensive studies of natural resources and watershed management of Ashgloo watershed-physiography, Eest Azarbaijan Agricultural and Natural Resources Research Center, AREEO. 2014.
17. Hossenpour A. Comprehensive studies of natural resources and watershed management of Ashgloo watershed-Hydrology. Eest Azarbaijan Agricultural and Natural Resources Research Center, AREEO.2014.
18. Luce C H, A B T. Sediment production from forest roads in western Oregon. Water Resour Res.1999; 35(8): 2561–2570.
19. Reid L M, Reid L M. Sediment production from forest road surfaces. Water Resour Res.1984; 20(11):1753–1761.
20. Habibzadeh A. Comprehensive studies of natural resources and watershed management of Ashgloo watershed-Geology and Geomorphology. Eest Azarbaijan Research Center, AREEO. 2016.
21. Foltz R B, BurroughsE R. Sediment production from forest roads with wheel ruts. symposium on watershed planning and analysis.1990; p:266–275.
22. Bilby, R E, Sullivan K, Duncan S H. The generation and fate of road surface sediment in forested watersheds in southwestern Washington. Forest Sci.1989; 35(2):453–468.
23. Kramer, B.W. Forest road contracting, construction, and maintenance for small forest woodland owners, Oregon State University, Forest Research Laboratory. Research Contribution.2001; 35(79).
24. WFPB. Washington Forest Practices Board Manual: standard methodology for conducting watershed analysis; 1997.version 4.0.
25. Yarahmadi J. Comprehensive studies of natural resources and watershed management of Ashgloo watershed-Climatology. Eest Azarbaijan Agricultural and Natural Resources Research Center; AREEO. 2014.
26. Ouyang D, Bartholic J. Reducing sediment delivery ratio in Saginaw Bay Watershed,Orlando. 1997; pp: 659–671.
27. WDNR. Standard methodology for conducting watershed analysis, Version 3.0. Washington Forest Practices Board;1995.